Fuel Tank Final Prep #1

As I near start of final assembly of the fuel tank, there are a lot of miscellaneous tasks I will need to tackle. Today I match drilled the fuel drain flange (VA-112) to the tank skin, finished out the build table with an additional back rivet plate, and started getting the DRDT-2 dimpler more rigidly mounted to the table. As soon as I got in the groove, it was time to head out for a day of tailgating and football watching with the boys. Below are some photos of the day.

1 comment

  1. Lots of detail work but I’m sure that seeing the end of this step is giving you lots of satisfaction

Leave a comment

Your email address will not be published. Required fields are marked *